Case studies

Hard Seltzer Brewery Automation

Location – Various, Worldwide Briggs of Burton have a strong in-house automation and control team located at our Global Technical Centre in Burton on Trent. Our team have the capability to provide site and remote support for your Hard Seltzer Software and Automation needs. Our remote support team can access and resolve plant issues 24 […]

Read more

Turnkey Malt and Grain Distillery in China

Location: Qionglai in the Province of Chengdu, China Scope: Briggs of Burton’s distillery engineering team have delivered an EPC/Turnkey project to the Shanghai Bacchus Company Ltd . The Greenfield distillery project (150,000 m²) will be developed in two phases: Phase I – 32.5 million litres pure alcohol (MLPA) capacity Phase 2 – an additional 32.5 […]

Read more

11 Skid based mixing systems

Location: Montrose, Scotland Scope: Mechanical design, build and installation of 11 skid based mixing systems for sterile aluminium salt production. Briggs of Burton have supported a major pharmaceutical company in designing, building, and commissioning a complete mixing suite capable of producing sterile aluminium salts. Aluminium salts are recognised to enhance the human body’s response to […]

Read more

Second Generation Biofuel Pilot Facility

Location: Guildford, England Scope: Overall process design and build of second generation pilot facility capable of handling a range of lignocellulosic feedstocks. Briggs of Burton worked with TMO Renewables to design and build their Process Development Unit (PDU) to scale-up from current laboratory operations and also optimise a bioethanol process for the commercialisation of the […]

Read more