Overall Scope

  • Design Study
  • Turn-Key Implementation
  • Engineering
  • Manufacturing
  • Group Brewing and Cellar equipment
  • Automation
  • Group collaboration on Cold Block
Engineering Services offered   
  • FEL 2.2 Study with phased expansion (1 to 3)
  • Detailed Design - Phases 1 and 2 - From Material Handling through Brewhouse and Cellars, plus CIP, Water and Utilities
  • PFD, P&IDs. Utilization and 3D - Modelling
  • Tender Specifications - FDS Development
  • Implementation – Phase 1
  • Brewhouse and cellar equipment procurement
  • BrewMaxx automation development and FAT
  • Installation, supervision and commissioning
Offering the Hard Seltzer Industry  
  • Concept Studies / Front-End Loading (FEL 1-3)
  • Detailed Design
  • Specialist Equipment Design and Manufacture
  • Leading Hard Seltzer Technologies
  • Process Engineering
  • Project Management
  • Functional Safety and Hazardous Area Design
  • Automation and Control